1. Advance Rate
(Glossary)
Speed of advance of a pipe jack or other trenchless installation through the ground, generally expressed as either millimetres per minute or metres per day. ...
2. Chemical Grouting
(Glossary)
Method for the treatment of the ground around a shaft or pipeline, using non-cementitious compounds, to facilitate or make possible the installation of an underground structure. ...
Method of lining with a continuous pipe for which the cross section is reduced to facilitate installation, and reverted after installation to provide a close fit to the existing pipe. ...
... after installation. ...
5. Crossing
(Glossary)
Pipeline installation in which the primary purpose is to provide one or more passages beneath a surface obstruction. ...
6. Discrete Sliplining
(Glossary)
... smaller than their final diameter after installation. ...
7. Drilling Fluid
(Glossary)
... the successful completion of the HDD installation.  ...
8. Ferro-Cement
(Glossary)
Material comprising cementitious and steel elements to form a structural lining, which is either placed in situ in a man-entry size pipeline or tunnel, or is preformed into segments for later installa
Method for the installation of pipes, conduits and cables using a surface-launched drilling rig. A pilot bore is drilled using a rotating drill string and is then enlarged by a back reamer to the size ...
10. Intersect Method
(Glossary)
Horizontial directional drilling method that allows accurate installation over longer distances than can be achieved by conventional means. The Intersect method employs two rigs starting from opposite ...
11. Jacking Shaft
(Glossary)
An excavation from which trenchless technology equipment is launched for the installation or removal of a pipeline, conduit, or cable. May include a thrust wall to spread reaction loads to the ground. ...
12. Live Insertion
(Glossary)
Method of installation of a liner while the product pipe remains in service. ...
13. New Installation
(Glossary)
Construction of a new pipe or underground utility to replace or upgrade an existing system or to provide new service.
14. Open Cut
(Glossary)
Underground construction method involving excavation from ground level to the level required for the installation, maintenance or inspection of a pipe, conduit or cable. Upon completion of the work, the ...
15. Pump Capacity
(Glossary)
... to successfully perform an installation.  ...
16. Reamers
(Glossary)
Downhole tools used to enlarge the bore sufficiently to facilitate installation of the product. ...
17. Spiral Lining
(Glossary)
Method of lining with a profiled strip, spirally wound to form a continuous pipe after installation. ...
18. Spoil
(Glossary)
Earth, rock, and other materials removed during installation. ...
19. Thrust/Pullback
(Glossary)
... perform an installation. ...
20. Torque
(Glossary)
... suitability to successfully perform an installation. ...
<< Start < Prev 1 2 3 Next > End >>

Search for Trenchless Events

Events Calendar

June  2017
Sun Tue Tue Wed Thu Fri Sat
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  
by pavoneggi