1. Intersect Method
(Glossary)
... ends of the project to create pilot bores using conventional drilling tools. A magnetic source is substituted for the conventional steering tool in one of the rigs, which allows the other rig to accurately ...
... in the jacking shaft, which projects a beam onto a target in the articulated steering section of the MTBM. The MTBM is steered by extending or retracting remotely controlled steering jacks.  ...
That part of a project, usually before renovation work on a pipeline, that includes preparatory cleaning and internal inspection. ...
... a walkover system is not possible due to the depth or surface conditions instead use wire lines to track progress. Operationally, an HDD project has a launch site where the rigs is set-up and positioned ...
5. Pipe Bursting
(News/Guidelines)
... water replacement projects typically involve installing new lines of 200 mm, 250 mm, or 300 mm between valve locations.  The majority of pipe bursting is employed for upsizing from 150 to 200 mm, ...
6. Communication & Outreach
(Pages/Generic)
... informative articles on trenchless projects and activities, reports on the activities of Affiliated Societies and of ISTT, carries timely messages from the Chairman and Executive Director of ISTT, and ...
7. Auger Boring
(News/Guidelines)
... existing casing pipe, and a new auger chain connected to the machine and to the existing chain/cutter head. The excavation and thrust process is repeated until the project is completed.  The auger ...
8. Pipe Splitting
(News/Guidelines)
... water replacement projects typically involve installing new lines of 200 mm, 250 mm, or 300 mm between valve locations.  The majority of pipe bursting is employed for upsizing from 150 to 200 mm, ...
9. The ISTT Team
(Uncategorised Content)
... Mr. Lovecký has worked on large projects in Germany, Iraq, Russia in the field of gas and petrochemical industry. He also was responsible for reconstruction of sewage systems in hazardous environments ...
... Illustrations should be inserted to the text (one file per entry). Specify the category of the award from below. There is no template but to include all the necessary information (especially for project ...
11. Awards and Recognition
(Uncategorised Content)
... project completed; (3) New machine, tool, material, system or technique introduced; and (4) Student or young professional paper. The Awards are presented yearly at the ISTT’s annual International No-Dig ...
12. 2011 ISTT No-Dig Award Winners
(Uncategorised Content)
NO-DIG AWARD Category: Project Rehabilitation - Company: Stroitelna Mehanizatsia AD - Country: Bulgaria Rehabilitation of Water Main in Sofia, Bulgaria This project is a testimonial ...
13. 2012 ISTT No-Dig Award Winners
(Uncategorised Content)
NO-DIG AWARD Category: Project - Company: Trenchless Technologies cc - Country: South Africa Port Elizabeth Goes Trenchless A team managed by Trenchless Technologies cc undertook ...
14. 2013 ISTT No-Dig Award Winners
(Uncategorised Content)
NO-DIG AWARD Category: Rehabilitation Project - Company: Interflow Pty Ltd for Sydney Water - Country: Australia Rehabilitation of Lidcombe, Auburn and Granville (LAG) Sewer Mains Complex ...
15. 2014 ISTT No-Dig Award Winners
(Uncategorised Content)
NO-DIG AWARD Category: Project - HDD - Company: Visser&SmitHanabbv  - Country: Netherlands Pre-Bent Drilling – A New Application of HDD   Visser&SmitHanab employed trenchless solutions ...
16. 2015 ISTT No-Dig Award Winners
(Uncategorised Content)
NO-DIG AWARD Category: Project - HDD - Company: EKOL YAPI INSAAT LTD.  - Country: Turkey   ESENYURT AMBARLI LOOP HATTI – HDD INSTALLATION OF LARGE DIAMETER PIPELINE IN ISTANBUL   ...
17. 2016 ISTT No-Dig Award Winners
(Uncategorised Content)
NO-DIG AWARD Category: Project - New Installation - Company: Construtora Passarelli  - Country: Brazil   Microtunneling between World Famous Rio Beaches   The ...
18. Past Winners
(Uncategorised Content)
... 2009) Award Category Company Country Description Project Interflow Pty Ltd Sekisui Rib Loc Pty Ltd Australia Rehabilitation of the North Georges River Submain, Sydney, Australia*: Interflow ...
19. Current year
(Uncategorised Content)
... were selected out of several nominations from all over the world by the ISTT International Board of Directors. Award category Name/Company Country Description* Project ...
20. 2017 ISTT No-Dig Award Winners
(Uncategorised Content)
NO-DIG AWARD Category: Project - New Installation - Company: Mears Group, Inc  - Country: USA   Underground Power Distribution from Nuclear Power Station ...

Search for Trenchless Events

Events Calendar

January  2018
Sun Tue Tue Wed Thu Fri Sat
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      
by pavoneggi